The Channel Tunnel, also known as the Chunnel, is a 50.5-kilometer (31.2-mile) undersea tunnel that connects the UK and France. It is the longest undersea tunnel in the world and was completed in 1994, after nearly 15 years of construction.

The project was a joint venture between the British and French governments and was undertaken by a consortium of private companies known as Eurotunnel. The tunnel consists of three tubes: two for trains and a smaller one for maintenance and emergencies. It is used primarily for passenger and freight trains, with a capacity of up to 50 trains per day in each direction.

The Chunnel project was not without its challenges. One major obstacle was the geology of the area, which consisted of soft chalk and clay that was prone to movement and landslides. To overcome this, the tunnel was built using a technique known as the "Shield Method," which involves using a large, mechanized tunneling machine to dig through the earth and support the tunnel walls with pre-cast concrete segments. This method allowed for the construction of a stable tunnel without the need for temporary support structures.

Another challenge was the cost and financing of the project. The initial estimates for the cost of the Chunnel were underestimated, leading to significant cost overruns. To fund the project, the consortium secured loans from banks and the European Investment Bank, as well as selling shares to the public. However, these measures were not enough to cover the full cost of the project, and the consortium was forced to seek additional funding from the British and French governments.

Despite these challenges, the Chunnel project was ultimately a success. It has greatly improved transportation links between the UK and France and has become an important part of the European transportation network. It has also had a significant economic impact, generating billions of pounds in revenue and creating thousands of jobs.

In conclusion, the Chunnel project was a major engineering feat that required overcoming significant technical and financial challenges. Its completion has had a lasting impact on transportation and economic ties between the UK and France, and it serves as a testament to the power of international cooperation and innovation.

Chunnel Project

chunnel tunnel project case study

It was basically composed of many subprojects: a downtown tunnel, a connecting cable-stayed bridge, and two consecutive tunnels under the harbor to the airport and many additional subsidiary sections. The complexity of this project would cause significant planning, logistical and communication challenges. The Chunnel represents one of the largest privately funded projects ever undertaken. At the time of the decision about building the tunnel, 15. The analysis would be deployed for easing the implication of the deployed modification Nicholas and Steyn 2017.

Next

The Chunnel Project

chunnel tunnel project case study

There may be multiple problems that can be faced by any organization. Developing such projects brings numerous frustrations. The different development standards of task administration are fused for the execution of the project and it would include the arrangement of the last deliverable supporting the execution of the enhanced undertaking execution and advancement. Each group fought for their own interests causing conflicts which hindered the progress of the project and negatively affected the reputation of both the country and the construction sector. Hanley, Moving People, Goods and Information in the 21 st Century , Routledge, p.

Next

Case study of The Chunnel Project

chunnel tunnel project case study

However, due to the implication of the delay factors, the project execution would be tampered. It was used to construct the tunnel and terminal's roof at the end of the Channel Tunnel. It would encompass the construction of the activities for supporting the ease of economic development and the utilization of the innovative technology Small 2014. In both cases financing was affected by the reluctance of the private sector to commit to a large project with a long gestation period and uncertain outcomes. This line feeds the fire hydrants in the cross passages and in the running tunnels.

Next

Channel Tunnel: Construction of the World's Longest Underwater Tunnel

chunnel tunnel project case study

Slide 8 Inception Phase 0 The ideas was to create a fixed transportation link between England and France. Developed by Siri Lassen-Urdahl The project, The Channel Tunnel, is one of the largest privately financed engineering project in history. Please highlight the major areas of strength in the management of this phase of the project: 1. Wolseley, 10 December 1881, in Correspondence with reference to the Proposed Construction of a Channel Tunnel , British Parl. The construction works for the Channel Tunnel started in 1987 and most of the tunneling work was finished by 1991. The English crossover is 8km 5mi from Shakespeare Cliff, and the French crossover is 12km 7mi from Sangatte.

Next

The Channel Tunnel: A case study of financing and governance after 25 and 125 years

chunnel tunnel project case study

Also, manipulating different data and combining with other information available will give a new insight. Firstly, the introduction is written. The implication would be responsible for the alignment of the factors. By the time tunnelling was under way in the early 1880s his view had hardened, and in 1881 he tried to persuade Joseph Chamberlain, the President of the Board of Trade, that the tunnel should be a public investment. Supported by the Rothschilds in France and the Nord railway, it was granted a concession for construction and began work on a pilot tunnel which extended to about 1,840 metres by 1883.

Next

complianceportal.american.edu

chunnel tunnel project case study

The completion of the project would be dependent on the activities of the project and it can be analysed with the help of project performance factors like cost performance index and schedule performance index. The difficulty in getting the two governments to pledge unequivocal support for the project tried the patience of business executives used to a more straightforward environment. Two of the tubes are full sized and accommodate rail traffic. The Chunnel project had been made for supporting the deployment of the effective employment development methods. Just one year after the Chunnel opened, this engineering design was put to the test. Year Freight transported tonnes through freight trains Eurotunnel Truck Shuttles est.

Next

Chunnel Project Case Study

chunnel tunnel project case study

Water from normal seepage is directed via channels into storage tanks or sumps at the lowest points and discharged by pipeline to the pumping stations. Thus, demands are made to guarantee the companies against the risks of cancellation, to severely limit the extent of equity financing, and to secure government guarantee of the loan capital. Megaprojects and Risk: An Anatomy of Ambition , ibid. Here defined as arrangements between the government or a public body and the private sector whereby a public service is delivered in co-operation. The frequency of such side probes depended on the potential problems.

Next

Channel Tunnel Project Case Study Solution and Analysis of Harvard Case Studies

chunnel tunnel project case study

Secondly, after identifying problems in the company, identify the most concerned and important problem that needed to be focused. They are essential in the stages of conception, development, and implementation. Implication The report consist of analysis and evaluation four project management concepts: Project Selection, Project Delivery System, Project Planning, and Project Control. At the shaft base, the excavated soil was mixed with water so that the mixture could easily be pumped away from the construction site to a dam for storage. Once tunneling began, construction trains with a variety of wagons were used to transport the linings, the spoil and the workers. After introduction, problem statement is defined.